200A Panel Upgrade in Cupertino, CA
A modern, solar- and EV-ready 200A service by a licensed C-10 team — sized by a real NEC load calculation, permitted and inspected. Your exact price in 24 hours from two photos.
- A new 200A meter-main (PG&E-compliant)
- New service conductors + mast/riser
- We pull the permit + coordinate PG&E
- Grounding, bonding & the final inspection
- A free Wi-Fi security camera (bonus)
"From" is a standard like-for-like 200A overhead service upgrade — one meter, same location. Underground service or trenching, a feeder to an ADU or detached structure, relocating the panel, a 400A service, long runs, or drywall repair are quoted separately after we see photos. We pull the permit and handle the inspection; City permit and PG&E fees are billed separately at cost, with the receipt. Some PG&E service upgrades require a refundable engineering deposit (about $3,500) — we tell you up front if yours does. Every upgrade also includes a free Wi-Fi security camera — a bonus, delivered with your job.
Licensed C-10 · CSLB #1114918 · Permitted & inspected · PG&E coordinated

A real Astral install — a finished 200A Schneider meter-main, permitted and inspected.
Astral Electrical — panel & service upgrade specialists in Cupertino.
A licensed C-10 team that does service upgrades — replacing obsolete and overloaded panels with a modern 200A service, sized by a real NEC load calculation. Not a handyman: we pull the permit, coordinate PG&E, and pass the final inspection on every job.
Panel upgrades in Cupertino: permits & your utility
In Cupertino, electric service is Pacific Gas & Electric (PG&E) and the building permit is issued by City of Cupertino. We pull the permit on every service upgrade, coordinate the meter pull and release with PG&E per their Electric & Gas Service Requirements (Greenbook, TD-7001M), and pass the final inspection — so your new service is safe, legal, and protects your home's value.
Permit & inspection: California Electrical Code, Title 24 Part 3; enforced by your city/county AHJ. Energizing: PG&E Electric Service Requirements (“the Greenbook”) — final inspection + meter release required before energizing.
An old panel is a hard ceiling — and sometimes a fire risk
A maxed-out 100A service can't add an EV charger, AC, an induction range or a heat pump — breakers trip and there's no room to grow. And some older panels are a documented hazard all on their own.
How full your panel gets
A typical home already pulls about 65A. Add an EV charger's 60A and you hit 125A — 25A over what a 100A panel can safely carry (the red zone). A 200A service fits it all with room to spare.
Illustrative load calculation. Your real demand is confirmed on site per NEC Art. 220 (load calculation).
Is it time to upgrade your panel? The signs.
Your panel is the heart of your home's electrical system — and it doesn't last forever. Here's how to tell it's time.
Warning signs to watch for
- Breakers trip often, or won't reset
- Lights flicker or dim when the AC, microwave or dryer kicks on
- The panel is warm to the touch, buzzing, or you smell burning / see scorch marks
- Fuses instead of breakers
- No open slots left — or “double-tapped” breakers (two wires under one breaker)
- You can't add an EV charger, heat pump, AC or induction range — no capacity
- Rust, corrosion or moisture inside the panel
- Still on 100A (or less) for a modern, mostly-electric home
How old is your panel?
Most panels last about 25–40 years. If yours is from the 1960s–80s — or you've never had it looked at — it's likely near the end of its life.
Real load capacity is confirmed by a load calculation — NEC Art. 220 (load calculation).
Know your brand
Some older panels are a documented hazard all on their own. If you see one of these, replacement is about safety, not just capacity.
Federal Pacific (FPE) / Stab-Lok
Breakers are widely documented to fail to trip. We strongly recommend replacement.
Zinsco / Sylvania-Zinsco
Breakers can fail or overheat, and the bus can melt — a documented fire concern.
Challenger, Pushmatic, Bulldog
Obsolete designs — parts are hard to find and safety is a real concern.
See any of these on your panel? It's the #1 reason we recommend an upgrade.
These brands are widely documented by inspectors, insurers and electrical-safety sources as failure-prone; framed as a concern, not a legal verdict. Overcurrent protection: NEC Art. 240.
Not sure what you have? Send two photos of your panel — we'll tell you, free — then your exact price in 24 hours.
Get my exact price →These are signs and risks, not a guaranteed verdict — the real answer comes from an on-site evaluation and a load calculation.
Know Your Panel.Know If It's Maxed Out.
Every panel has a limit. A 100A service that's already running the AC, oven, dryer and water heater has little room left — and none for an EV, solar or a heat pump. We confirm where you stand with a real NEC load calculation, not a guess.
The result — a modern 200A service, done once
- Correct 200A sizing
- Code compliant
- Reliable, no more trips
- Ready for EV, solar & heat pump
That's why step one is a quick photo of your panel — we tell you exactly where you stand, and your exact price, before you pay anything.
Get my exact price →Panel capacity used
GuideYour service has real headroom — you can likely add loads without an upgrade.
Limited capacity — adding an EV, AC or heat pump may push you over.
The panel is close to its limit — an upgrade to 200A is likely needed.
At or past capacity — breakers trip and the service can overheat. Upgrade first.
These are general guidelines. The exact requirement depends on your property, equipment, and future plans — we confirm it with a load calculation.
NEC Art. 220 (load calculation).
Handyman, electrician, or licensed contractor?
A service upgrade touches the meter and the grid, so it's not a handyman job. Only a licensed contractor can pull the permit, coordinate PG&E, and sign off on the work.
Contractor — Astral
Astral Electrical is a licensed C-10 electrical contractor (CSLB #1114918) — bonded, insured, and accountable for the NEC load calc, the permit, the PG&E coordination and the final inspection.
Service & conductors: NEC Art. 230 (services). Permit & inspection: California Electrical Code, Title 24 Part 3; enforced by your city/county AHJ. Energizing: PG&E Electric Service Requirements (“the Greenbook”) — final inspection + meter release required before energizing.
What the unpermitted service upgrade really risks
In Cupertino, a service upgrade must be permitted, inspected, and coordinated with PG&E. Here's what the shortcut costs.
With Astral Electrical it's done by a licensed C-10 contractor (#1114918), bonded and insured, permitted, PG&E-coordinated and inspected — safe, legal, and yours to keep.
Why Cupertino homeowners call Astral Electrical
The credentials that matter for a service upgrade — so you can decide before you ever reach out.
Licensed C-10 #1114918
A real California C-10 electrical contractor, bonded and insured — the only one who can legally pull your service permit and coordinate PG&E. Not an app, not a handyman.
Service-upgrade specialists
We replace obsolete and overloaded panels with modern 200A service every week — sized by a real NEC load calculation, not a guess.
Permitted & inspected, every job
We pull the permit, coordinate the PG&E meter pull and release, and pass the final inspection. No unpermitted work, ever.
Recent 200A panel upgrades
Mountain House · Atherton · Los Altos
These are our actual panel upgrades — not stock photos. Modern 200A meter-mains, new overhead masts and clean service work by our C-10 team. Trusted with service upgrades from Mountain House to Atherton and Los Altos — permitted, inspected, and finished the way we'd want it on our own home.




What does a 200A panel upgrade cost in Cupertino?
A standard overhead 200A service upgrade starts at $7,500. Send two photos and we send your exact price within 24 hours — no truck roll.
Everything in the from-$7,500 200A upgrade
No markup surprises. City permit and PG&E fees are billed separately at cost, with the receipt. This is a standard overhead 200A service upgrade, done right.
A new 200A meter-main
A modern, PG&E-compliant 200A meter-main with a lever bypass — replacing your obsolete or overloaded panel.
NEC Art. 408 (panelboards).
New service conductors + mast/riser
New service-entrance cable, and a new mast or riser where your overhead service needs one.
NEC Art. 230 (services).
Grounding & bonding, brought to code
A proper grounding electrode system and bonding — the part a handyman skips.
NEC Art. 250 (grounding & bonding); fault-current marking per NEC 110.24.
Every circuit transferred & labeled
All of your house circuits moved over to the new panel on correct overcurrent protection, and a clear directory.
NEC Art. 240 (overcurrent protection).
We pull the permit + coordinate PG&E
Filed in our name, with the utility coordination to pull and reset your meter. City permit and PG&E fees are billed separately at cost, with the receipt.
The final inspection
Passed and on the record — required before PG&E energizes your new service.
California Electrical Code, Title 24 Part 3 (AHJ); PG&E Greenbook — final inspection + meter release required before energizing.
A free Wi-Fi security camera
A genuine bonus with every upgrade — delivered with your job, so you can keep an eye on your new service and panel.
What's quoted separately — honestly
"From" is a standard like-for-like 200A overhead service upgrade — one meter, same location. Underground service or trenching, a feeder to an ADU or detached structure, relocating the panel, a 400A service, long runs, or drywall repair are quoted separately after we see photos. We pull the permit and handle the inspection; City permit and PG&E fees are billed separately at cost, with the receipt. Some PG&E service upgrades require a refundable engineering deposit (about $3,500) — we tell you up front if yours does. Every upgrade also includes a free Wi-Fi security camera — a bonus, delivered with your job.
Service & conductors: NEC Art. 230 (services). Panelboard: NEC Art. 408 (panelboards). Grounding & bonding: NEC Art. 250. Available fault-current marking: NEC 110.24.
When it's not the standard upgrade
Full cost guide →A panel upgrade is the job most electrification starts with — it's the capacity that lets you add an EV charger, heat pump or solar safely. Here's what it really costs in our area, and what actually moves the number.
Typical ranges for the Santa Clara County area, not a quote. Send two photos and we confirm your exact number within 24 hours.
From two photos to a modern 200A service — and what you pay, when
A deposit to start. The balance is due the day we do the work — never tied to the inspection.
Send 2 photos
Your panel, and your meter/service. From your phone — no truck roll.
We send your exact price
A licensed C-10 reviews your photos and sends your firm price within 24 hours.
NEC Art. 220 (load calculation).
Simple agreement
A clear flat-price agreement — with a 3-day right to cancel.
Deposit to schedule
A deposit locks your spot on the schedule. That's all it takes to begin.
Deposit to startWe coordinate PG&E + pull the permit
Filed in our name with your city, and we schedule the meter pull with PG&E.
Permit fee, at costCalifornia Electrical Code, Title 24 Part 3 (AHJ).
Upgrade day
We swap the service, set the new 200A meter-main, ground and bond it, and transfer your circuits.
Balance due at installationNEC Art. 230 (services); NEC Art. 250 (grounding & bonding).
Final inspection
The city inspects and PG&E releases the meter to energize — permitted and on the record. Not a payment step.
PG&E Greenbook — final inspection + meter release required before energizing.
A deposit secures your spot; the balance is due at installation, the day we do the work. Any separately-quoted work is agreed in writing before it starts.
Get my exact 200A upgrade price in Cupertino
Two photos is all it takes to get your exact price — in 24 hours, no truck roll. Here's the whole path:
- 1Send your 2 photos — your panel + your meter/service.
- 2We send your exact 200A upgrade price within 24 hours (from $7,500).
- 3We send your simple agreement (3-day right to cancel).
- 4A deposit locks your spot — we coordinate PG&E and pull your permit.
- 5Balance at installation, the day we do the upgrade.
Licensed C-10 #1114918 · Astral Electrical, serving Cupertino. Prefer to talk? Call (650) 562-8594.
Panel upgrades near Cupertino
Astral Electrical upgrades panels and services across Santa Clara County and the wider Central Valley and Bay Area. Same licensed C-10 specialists, same permit-and-inspection promise, same honest from-$7,500 standard.
Panel upgrade in Cupertino: FAQ
How much does a 200A panel upgrade cost in Cupertino?+
A standard overhead 200A service upgrade — one meter, same location — starts at $7,500. That covers a new 200A meter-main, new service conductors and mast/riser, grounding and bonding, transferring and labeling all your circuits, pulling the permit, PG&E coordination and the final inspection — plus a free Wi-Fi security camera as a bonus. City permit and PG&E fees are billed separately at cost, with the receipt. Underground service or trenching, a feeder to an ADU, relocating the panel, a 400A service, long runs or drywall repair are quoted separately. Send two photos — your panel and your meter/service — and we send your exact price within 24 hours.
How do I know if I need a panel upgrade in Cupertino?+
Common signs: an obsolete Zinsco or Federal Pacific (Stab-Lok) panel, a 100A service, breakers that trip often, or plans to add an EV charger, solar, a heat pump or an induction range. A licensed C-10 electrician confirms it with an NEC load calculation — so you're never sold something you don't need.
Are Federal Pacific, Zinsco or Challenger panels really dangerous?+
Yes. Federal Pacific (FPE / Stab-Lok), Zinsco and certain Challenger panels are widely documented to fail to trip under overload or fault — a genuine fire hazard still in millions of homes. They're commonly recommended for replacement and can raise your insurance premiums or void coverage. If you have one, replacement is about safety, not just capacity.
Why 200A instead of the minimum in Cupertino?+
The NEC load calculation sets a code minimum, but going to 200A leaves real headroom for an EV charger, solar, a battery and a heat pump — so you upgrade once instead of paying to open the panel again in a few years.
Do you pull the permit and coordinate PG&E in Cupertino?+
Always. A service upgrade touches the meter and the grid, so only a licensed contractor can do it legally. We pull the permit with your local building department, coordinate the meter pull and release with PG&E (per their Greenbook), bring it to current NEC code, and pass the final inspection — which is required before PG&E energizes your new service. Some PG&E upgrades require a refundable engineering deposit (about $3,500); we tell you up front if yours does.
How do I pay, and when, in Cupertino?+
A deposit secures your spot on the schedule. The balance is due at installation — the day we do the upgrade — never tied to the inspection. The inspection is the city's step, not a payment trigger.
Ready for a modern 200A service in Cupertino?
Send two photos and get your exact price — from $7,500 — confirmed by a licensed C-10 within 24 hours.







