EV Charger Installation in Sunnyvale, CA
You want to charge at home in Sunnyvale — here's everything you're wondering, answered. A Tesla- & ChargePoint-Certified, licensed C-10 Level 2 install for one flat, all-in price.
- Your charger on a dedicated 60A circuit
- Up to 5 ft of cable from the panel
- We pull the permit + handle the final inspection
- A free Wi-Fi security camera, in the box
Installation only: you supply the charger, we install it. Flat $1,650 applies to homes with a 200A main panel that has available capacity, with the charger within 5 ft of the panel. We pull the permit and handle the final inspection on every install — we never do unpermitted work. City permit and PG&E fees are billed separately at cost, with the receipt. A 100A/125A or full panel, a required panel or service upgrade, longer runs, trenching, or finished-wall fishing are quoted separately after we see photos — never a surprise.
Licensed C-10 · CSLB #1114918 · Tesla & ChargePoint Certified · Permitted & inspected

A real Astral install — Tesla Wall Connector, permitted and inspected.
The EV charger installation specialists at Astral Electrical in Sunnyvale.
Our EV charging division. Tesla-Certified and ChargePoint-Certified installers who install every major EV charger — Tesla, ChargePoint, Wallbox, Autel, and more. Not a general handyman — a licensed C-10 team that does EV charging, all day.
EV charging in Sunnyvale: permits & your utility
In Sunnyvale, electric service is Pacific Gas & Electric (PG&E) and the building permit is issued by City of Sunnyvale. We pull the permit on every EV charger install, coordinate the circuit and any meter work to PG&E's Electric & Gas Service Requirements (Greenbook, TD-7001M), and pass the final inspection — so your install is safe, legal, and protects your home's value.
Permit & inspection: California Electrical Code, Title 24 Part 3; enforced by your city/county AHJ. Service/panel upgrades: PG&E Electric Service Requirements (“the Greenbook”) — final inspection + meter release required before energizing.
The difference you feel every morning
A standard wall outlet trickles. A Level 2 charger fills the car overnight. Same garage, very different life.
120V standard outlet
~3–5 miles of range per hour
30–40+ hours to fill from near-empty — you plan your life around charging.
Level 2 (240V)
~25–40+ miles of range per hour
Fills overnight — you wake up to a full battery and never think about it.
Add-rate is approximate and varies by vehicle, battery and charger. Figures shown for comparison only.
Handyman, electrician, or licensed contractor?
Who installs your charger decides whether it's safe, legal, and yours to keep. Here's what each actually does.
Contractor — Astral
Astral Electrical is a licensed C-10 electrical contractor (CSLB #1114918) — bonded, insured, Tesla- and ChargePoint-Certified, and accountable for the permit and the final inspection.
Permit & inspection: California Electrical Code, Title 24 Part 3; enforced by your city/county AHJ.
What the unpermitted install really risks
In Sunnyvale, you want a dedicated EV specialist — a licensed C-10 contractor — not a handyman. Here's what the shortcut costs.
With Astral Electrical it's done by a licensed C-10 contractor (#1114918), bonded and insured, permitted and inspected — safe, legal, and yours to keep.
Why Sunnyvale homeowners call Astral Electrical
The credentials, and our own work — so you can decide before you ever reach out.
Tesla- & ChargePoint-Certified
Certified installers of Tesla Wall Connectors and ChargePoint — and we install every major charger (Wallbox, Autel, any J1772 / NACS).
Licensed C-10 #1114918
A real California C-10 electrical contractor, bonded and insured — not an app, not a handyman.
Permitted & inspected, every job
We pull the permit and get every install inspected. No unpermitted work, ever.
Recent EV installs
These are our actual installs — not stock photos. Tesla Wall Connectors, outdoor runs and clean conduit by our C-10 team. Permitted, inspected, and finished the way we'd want it in our own garage.






Know Your Panel.Charge with Confidence.
Your electrical panel has a limited capacity. Before we install an EV charger, we evaluate your panel to make sure it can handle the extra load safely — a real load calculation, not a guess.
The result — a safe & future-ready installation
- Correct sizing
- Code compliant
- Reliable performance
- Ready for your needs
That's why step one is a quick photo of your panel — we tell you exactly where you stand before you pay anything.
Schedule my installation →Panel capacity used
GuideYour panel has enough available capacity to support an EV charger.
Limited capacity — we may adjust the load or plan for a future upgrade.
The panel is close to its limit — an upgrade is likely needed.
At or near full capacity — we'll increase the panel size or reconfigure.
These are general guidelines. The exact requirement depends on your property, equipment, and future plans — we confirm it with a load calculation.
NEC Art. 220 (load calculation); EVSE load per NEC 220.57.
What does EV charger installation cost in Sunnyvale?
We gave you the price up front — $1,650, all-in. Here's exactly what that covers, and what's quoted separately.
Everything in the $1,650
No markup surprises. City permit and PG&E fees are billed separately at cost, with the receipt.
Tesla- & ChargePoint-Certified install
Your charger mounted, wired and tested by a certified installer.
A dedicated 60A circuit
Its own breaker, sized for a 48A continuous charger (within 5 ft of the panel).
We pull the permit
Filed in our name. The City permit fee is billed separately at cost, with the receipt.
The final inspection
Passed and on the record — safe for your home, insurance and resale.
A free Wi-Fi security camera
Delivered in the box with every all-in install — a genuine bonus.
Tesla Dynamic Power Management
No room in your panel? Skip the $7,500+ panel upgrade. We install Tesla's Remote Meter so your Wall Connector watches your home's live load and adjusts charging automatically — set up by a Tesla Certified Installer. $895 with the Remote Meter and installation included, added to your EV install. Requires a Tesla Wall Connector (Gen 3).
City permit and PG&E fees, if any, are billed separately at cost, with the receipt.
Dedicated circuit & sizing: NEC 625.40 (EVSE on an individual branch circuit) · sized at 125% of continuous load per NEC 625.41, 210.19(A) & 210.20(A). Permit & final inspection: California Electrical Code, Title 24 Part 3, enforced by your city/county AHJ.
What waiting (or guessing) really costs
A single diagnostic electrician visit runs $150–300. A surprise panel upgrade discovered mid-project runs into the thousands. A botched, unpermitted install can cost you at resale or with your insurer. The flat $1,650 — permitted, inspected, certified — is the number precisely so there are no surprises.
The 60A circuit is sized at 125% of a 48A continuous load per NEC 625.41, 210.19(A) & 210.20(A); the charger is on its own branch circuit per NEC 625.40.
When it's not the standard install
Full cost guide →The price of a home EV charger is mostly about the run and your panel — not the charger. Here's what a done-right, permitted Level 2 install really costs in our area.
Panel out of room? Before a panel upgrade, ask about Tesla Dynamic Power Management: $895 installed with a Tesla Wall Connector (Gen 3). City permit and PG&E fees, if any, are billed separately at cost, with the receipt.
Typical ranges for the Santa Clara County area, not a quote. Send two photos and we confirm whether it's the flat $1,650 or needs a separate line.
From two photos to charging — and what you pay, when
No money up front for the whole job. You pay as it progresses.
Send 2 photos
Your panel, and where the charger goes. From your phone.
We confirm it qualifies
A C-10 checks a 200A panel with capacity and a run within 5 ft.
NEC Art. 220 (load calculation); EVSE load per NEC 220.57.
Simple agreement
A clear flat-price agreement — with a 3-day right to cancel.
$165 deposit (10%)
Locks your spot on the schedule. That's all it takes to begin.
You pay $165We pull your permit
Filed in our name with your city.
Permit fee, at costCalifornia Electrical Code, Title 24 Part 3; enforced by your city/county AHJ.
Install
We run the dedicated circuit, mount and test your charger — you're charging the same day.
Balance dueNEC 625.40 (EVSE on an individual branch circuit).
Final inspection
The city inspects and signs off — permitted and on the record.
California Electrical Code, Title 24 Part 3; enforced by your city/county AHJ.
A $165 deposit is 10% of the flat $1,650 install. Any separately-quoted work is agreed in writing before it starts.
Start my $1,650 installation in Sunnyvale
Two photos is all it takes to get your exact price and lock your spot. Here's the whole path:
- 1Send your 2 photos — panel + where the charger goes.
- 2We confirm it qualifies (200A panel, charger within 5 ft).
- 3We send your simple agreement (3-day right to cancel).
- 4You pay the $165 deposit (10%) — we lock your spot and pull your permit.
- 5Balance at installation, when we install your charger.
Licensed C-10 #1114918 · Tesla & ChargePoint Certified · Astral Electrical, serving Sunnyvale. Prefer to talk? Call (650) 562-8594.
EV charger installation near Sunnyvale
Astral Electrical installs EV chargers across Santa Clara County and the wider Central Valley and Bay Area. Same flat $1,650, same licensed C-10 specialists, same permit-and-inspection promise (City fees billed at cost).
EV charger installation in Sunnyvale: FAQ
How much does it cost to install an EV charger?+
Every home is different, so the price depends on your panel, the distance from the panel to the charger location and whether any upgrades are needed. Our licensed electrician gives you the exact price after the visit. In Sunnyvale, a straightforward install is $1,650, all-in — that covers installing your charger, a dedicated 60A breaker, up to 5 ft of cable from the panel, pulling the permit and the final inspection, plus a free Wi-Fi security camera. City permit fees are billed separately at cost, with the receipt. A recent Stockton install came in at $1,050. The flat price assumes a standard job: the panel in the garage or a factory 'Future EV charger' box, and a short run. Longer cable runs, trenching, fishing a finished wall, attic routing, or a panel that's out of capacity are quoted separately after we see a couple of photos — never a surprise.
Do I need a panel upgrade to install an EV charger?+
Not always. If your panel is close to its limit, an automatic load management system (EVEMS, allowed by NEC 625.42) can add an EV charger on your existing service by reducing charging when your home is using a lot of power. It is usually faster and less expensive than a service upgrade. If an upgrade is the better option, we handle the full process, including the permit and PG&E coordination.
What size breaker does a Tesla Wall Connector need?+
For full speed, a Tesla Wall Connector charges at up to 48A and requires a 60A dedicated circuit, because EV charging is a continuous load and the circuit must be rated at 125% of the charging current. If your panel has less capacity, the Wall Connector can be set to a lower current with a smaller breaker. Our electrician will size it for your home.
Can two or more Tesla Wall Connectors be daisy-chained on one circuit?+
It depends on the model. The Tesla Universal Wall Connector supports daisy chaining: multiple units share one 60A circuit, limited to 48A total, and Tesla's software splits the power between the cars that are charging. The standard Tesla Wall Connector (Gen 3, NACS) cannot be daisy-chained. Each unit needs its own circuit, but up to six units can use Tesla's Power Sharing over Wi-Fi so they never overload the panel. Our licensed electrician will review your panel and recommend the best setup.
What is Tesla Wall Connector Power Sharing?+
Power Sharing lets up to six Gen 3 Tesla Wall Connectors work as one network over Wi-Fi. One unit acts as the leader and shares the available power between all connected cars, so you can charge several EVs without exceeding the limit set for your electrical panel. Each Wall Connector is installed on its own circuit, and the electrician sets the total limit based on a load calculation.
Can I install a second EV charger if I already have one?+
Yes. Depending on your panel, a second charger can go on its own circuit, or both chargers can share power using Tesla Power Sharing, the Universal Wall Connector daisy chain, or an automatic load management system. We will review your panel and recommend the most cost-effective option.
Do I need a permit to install an EV charger in California?+
Yes. EV charger installations in California require an electrical permit and inspection from your city or county. Astral Electrical handles the permit and the inspection as part of the installation. The City permit fee is billed separately at cost, with the receipt.
Building a new home in Sunnyvale?+
Perfect timing. If your garage walls are still open, we rough-in the EV charger circuit before drywall — no fishing walls later, no patching. You move in EV-ready, and it's the cheapest it will ever be to run. We coordinate with your builder's schedule in Santa Clara County.
Are there EV charger rebates in Sunnyvale?+
Often yes — California's CALeVIP program and PG&E have offered EV-charging and panel-upgrade incentives, and they change by round and by address. We tell you what's open when we quote; check our rebates page for what's live now.
Are you a Tesla Certified Installer?+
Yes. Astral Electrical is a Tesla Certified and ChargePoint certified installer, licensed in California (C-10 #1114918), serving all nine Bay Area counties.
Before you cut a corner, read this
An EV charger is not a normal outlet. It's a 40–48 amp load that runs for hours, night after night — the single appliance most likely to find the weak spot in your electrical system. So here's the truth, plainly, so you decide with your eyes open.
“What if my panel isn't 200A, is old, or full?”
Then we find out before we touch it — not after. If any of these are true, your charger may need a panel or service upgrade first:
- It's not 200A, or it's completely full with no open slots
- It's an old split-bus panel, or a recalled brand (Federal Pacific, Zinsco, Challenger)
- Breakers trip, the panel feels warm, hums, or has scorch or rust
- You already run a dryer, range, A/C or a hot tub near its limit
We size it with a real NEC load calculation, not a guess. If there's capacity, you get the flat price. If there isn't, we tell you honestly — because forcing a continuous charger onto a maxed-out or unsafe panel is how a bus bar overheats behind your wall.
NEC 220 (load calculation) · NEC 625.42 & 210.19(A)/210.20(A): a charger is a continuous load, so the circuit and service are sized to 125% of it. Paraphrased; we verify every job on-site.
“Can I still run my dryer and oven?”
Yes — that's the whole point of the load calc. We add the charger without starving the rest of your home. If the numbers are tight, you have options: a right-sized circuit, load management (the charger automatically eases off when the dryer or A/C kicks on), or the upgrade. You never have to choose between charging and laundry.
“I need to charge now. Why wait for a permit — the handyman's cheaper.”
We hear it a lot. Here's the honest math: the unpermitted, unlicensed install is the expensive one. It just sends the bill later.
- The permit is the law, and the safety. The inspection is a second licensed set of eyes on the one circuit most likely to start a fire. We pull it on every job.
- Heat doesn't trip a breaker. A loose lug or undersized wire on a charger won't pop a breaker — it just gets hot, for hours, inside your wall. That's the failure mode of a rushed job.
- Your insurance can say no. A fire traced to unpermitted, unlicensed work can be denied — and then the whole house is the loss, not the charger.
- It follows you to the sale. Unpermitted work surfaces at appraisal and resale, and it can discount or stall the deal.
- No license, no recourse. When it fails, the handyman is gone and you own it. A licensed C-10 carries the warranty and the liability.
Cheaper today is not cheaper. Done once, done right, permitted and inspected — that's the version that actually protects the six-figure asset it's bolted to.
California Electrical Code (Title 24, Part 3) & your local building department require a permit and inspection for EV charger circuits · NEC 110.14 covers proper terminations (loose connections overheat). Paraphrased.
Our promise is simple: we'd rather lose the job than wire your home to fail. If it's safe and simple, you get the flat price. If it needs more, you get the truth. Either way, you win.
Ready to charge at home in Sunnyvale?
Send two photos and get your flat $1,650 confirmed by a licensed C-10 specialist today.







